BEND, Ore. (KTVZ) — Here’s a city of Bend’s weekly highway and trade news for a week of Apr 19-25.

As a open flowers start to emerge, an denote of warmer continue to come, so too are a orange construction signs, indicating a commencement of a bustling construction season. As we navigate your approach by a City streets and neighborhoods, greatfully remember to delayed down, review a signs and stay on a designated highway routes. Check in weekly with a City on arriving closures by a website: bendoregon.gov/traffic. Construction deteriorate will not final forever, greatfully be studious and remember to expostulate like you’re in your possess neighborhood.

  • NW Skyline Ranch Road between NW Chianti Lane and NW Shevlin Meadow Drive for infrastructure installation, full highway closure, starts 4/12/2021
  • Deschutes Market Road between Margaret Lane and Pioneer Loop for infrastructure designation associated to a north interceptor project, singular line closure with flagging, 4/19/21, 1 p.m. – 3 p.m.
  • NE Sedalia Lane between NE Dalton Street and NE Tierra Road for infrastructure installation, full highway closure, 4/21/21 – 4/30/21
  • NW Skyliners – Mt Washington Intersection – Closed for devious reformation and walking channel updates from Mar 29th – Apr 23rd. For serve information on this and destiny travel refuge work, visit bendoregon.gov/streetpreservation.
  • McClain Drive between NW Shevlin Park Road and NW Shevlin Meadow Drive for infrastructure installation, work began 11/30/20
  • SW Colorado – Columbia intersection – Closed for Roundabout construction commencement Mar 1st – mid-May. Additional highway closures associated to closure listed below. For serve information, revisit www.bendoregon.gov/Columbia-roundabouts.
    • Colorado Avenue between SW Emkay Drive (west) and SW Emkay (east)
    • SW Columbia Avenue sealed between SW Emkay Drive and SW Disk Drive
  • Desert Woods Neighborhood Extension Project – Roads sealed for Sewer categorical designation with internal access, 3/8/21 – 5/31/21. For serve information, visit bendoregon.gov/desertwoods.
    • East Lake Drive between Twin Lakes Loop and Newberry Drive
    • Twin Lakes Loop Between SE 15th Street and Newberry Drive
  • SE Murphy Road between Country Club and Parrell Road for alley widening and modernization, full highway closure with internal entrance and detours, Nov 2020 – Summer 2021
  • US HWY 97 between Exit 135A and Exit 139 to Reed Market Road for ODOT overnight resurfacing, southbound lanes with highway onto US 97 Business Route (3rd Street). 3/15/21 – 5/15/21
  • US HWY 97 between Exit 139 and Exit 141 to Murphy Road for ODOT overnight resurfacing, southbound lanes with highway onto US 97 Business Route (3rd Street). 3/15/21 – 5/15/21
  • SW Simpson Avenue between SW 15th Street and SW 18th Street for right of approach improvements, full highway closure with detour, 3/15/21 – 5/1/21
  • Newport Corridor Improvements Project – Various intersections along Newport Avenue to be sealed due to updates in a H2O categorical and stormwater facilities. Road closures associated to a plan listed below.
    • NW Nashville Ave between NW Drake Road and NW Newport Ave for infrastructure installation, full highway closure, starting 4/5/21
    • Intersection of 9th Street and Newport Avenue for infrastructure installation, full devious closure with detour, starting 4/5/21

Future Road Closures:

  • NE 3rd travel between Lafayette Avenue and Marshall Avenue for H2O use line removal, southbound delayed line closure, 4/26/21 – 4/30/21, 9 a.m. – 3 p.m.
  • Intersection of Purcell Boulevard and Butler Market Road for devious construction, full intersection closure with detour, work starts 5/3/21

Work schedules are contingent on continue conditions and other factors. Always practice increasing counsel within construction zones. Drivers should use designated highway routes. Nearby residential streets are for internal trade only.

Contact: Kyle Thomas, Construction Manager

541-323-8519, kthomas@bendoregon.gov

For Street Preservation associated questions: Paul Neiswonger, Streets Supervisor

541-317-3035, pneiswonger@bendoregon.gov

Closures and detours in Bend are updated weekly at: bendoregon.gov/traffic

Find some-more information about travel operations at: bendoregon.gov/streetpreservation

Weekly reports can be perceived around email by subscribing to Weekly Road and Traffic Reports at: bendoregon.gov/enews