We’re now in a center of construction season! As we navigate your approach by a City streets and neighborhoods, greatfully remember to delayed down, review a signs and stay on a designated highway routes. Check in weekly with a City on arriving closures by a website: bendoregon.gov/traffic. Construction deteriorate will not final forever, greatfully be studious and remember to expostulate like you’re in your possess neighborhood.

  • SW Simpson – Columbia intersection – Closed for Roundabout construction commencement May 17th – August. Full closure of intersection with detour. For serve information, visit bendoregon.gov/Columbia-roundabouts.
  • Newport Avenue Bridge over Deschutes River sealed between NW Brooks Street and NW Awbrey Road for overpass resurfacing, highway to Portland Avenue, 7/26/21 – 7/30/21
  • Parrell Road between Rocca Way and SE Lois Way for infrastructure installation, singular line closure with flagging, 7/19/21 – 7/30/21
  • Street Preservation – Additional travel refuge is set to flog off subsequent week with several travel closures with internal trade only. Milling and paving set to be finished from 7/16/21 – 8/11/21. Streets influenced are listed below:
    • Keyte Road, Savannah Drive, Azure Drive, Ponderosa Street, Blakely Road, Cliffrose Drive, Burnside Avenue, Riverside Boulevard, Donovan Avenue, Emkay Drive, and Cyber Drive
  • Pump Station Decommissioning – This plan will decommission a Tri-Peaks, Shire, and Desert Skies Pump Stations. Full highway closures with internal entrance usually on influenced streets commencement on 7/19/21. For serve information, visit bendoregon.gov/city-projects/what-s-being-built/pump-station-decommissioning-phase-3.
    • Clairaway Avenue between 27th Street and Daly Estates Drive
    • Daly Estates Drive between Clairaway Avenue and a dried skies siphon station
  • NW Silver Buckle Road – As partial of a Rimrock Pump Stations Improvement project, full highway closure during work hours 7 am – 6:30 pm. Roadway to be entirely reopened during finish of any workday and intermittently non-stop during any workday during 10 am and 2 pm; 7/19/2021 – 11/19/2021.
  • Intersection of SE 15th Street and SE Caldera Drive for devious construction, full intersection closure with highway (shoefly highway constructed), 7/14/21 – 9/10/21
  • NE Wells Acres Road (from NE 27th Street to NE Weeping Willow Drive) – Underground electrical passage construction. Daytime line closures and flagging. Side travel work also approaching on NE Weeping Willow Drive and NE Brian Ray Ct. Temporary on-street parking restrictions in neighborhood. 6/28 to 7/30. For serve information, visit bendoregon.gov/streetsafety
  • NE 8th Street between NE Marlon Place and NE Bennington Way for infrastructure installation, singular line closure with minimal impacts, starts 5/24/21
  • NE Butler Market – Purcell Intersection – sealed for devious construction commencement May 3rd – mid-September. This is partial of a Empire Corridor Improvements Project. For serve information, visit bendoregon.gov/empire.
  • NW Skyline Ranch Road between NW Chianti Lane and NW Shevlin Meadow Drive for infrastructure installation, full highway closure, 4/12/21 – 7/30/21
  • Via Sandia Neighborhood Extension Project – Roads sealed for Sewer categorical designation with internal access, 5/17/21 – 8/31/21. For serve information, visit bendoregon.gov/city-projects/infrastructure-projects/septic-to-sewer-conversion-program/via-sandia-east-lake-drive-orion-drive-sewer-project.
    • East Lake Drive between Twin Lakes Loop and Newberry Drive (5/17/21 – 8/3/21)
    • Twin Lakes Loop Between SE 15th Street and Newberry Drive (5/17/21 – 8/3/21)
    • Via Sandia between Sky Harbor Drive and Cabin Court (5/17/21 – 8/5/21)
    • Cabin Ct between Via Sandia (5/17/21 – 8/5/21)
    • Orion Drive between Reed Market Road and Perrigan Drive (7/19/21 – 8/31/21)
  • Newport Corridor Improvements Project – Various intersections along Newport Avenue to be sealed due to updates in a H2O categorical and stormwater facilities. Visit bendoregon.gov/newportimprovements to learn some-more about a project. Road closures associated to a plan are listed below:
    • NW Nashville Ave between NW Drake Road and NW Newport Ave for infrastructure installation, full highway closure, starting 4/5/21
    • Intersection of 9th Street and Newport Avenue for infrastructure installation, full devious closure with detour, starting 4/5/21
    • Newport Avenue between NW College Way and NW Juniper Street, singular line closure and line shifts probable with full closure probable subsequent week, 7/26/21 – Late November
  • 2021 Bend Criterion Series – special eventuality occurring each Wednesday 8/1/21, 8 a.m. – 12 p.m. Multiple Road closures associated to eventuality (listed below).
    • NW Crosby Drive between NW Skyline Ranch Rd
    • NW Elwood Lane between NW Crosby Drive and NW Lolo Drive
    • NW Lolo Drive between NW Elwood Lane and NW Skyline Ranch Road
    • NW Skyline Ranch Road between NW Lolo Drive and NW Crosby Drive
  • NW Crossing Farmers Market – special eventuality occurring each Saturday 6/5/21 – 10/16/21. Multiple highway closures associated to eventuality (listed below).
    • NW Crossing Drive between Mount Washington Drive and NW Crossing Drive (Circle)
    • NW John Freemont between NW Ordiway Avenue and NW Fort Clatsop Street
    • NW Fort Clatsop Street between NW Ordway Avenue and NW John Freemont Street

Work schedules are contingent on continue conditions and other factors. Always practice increasing counsel within construction zones. Drivers should use designated highway routes. Nearby residential streets are for internal trade only.

Contact: Kyle Thomas, Construction Manager

541-323-8519, kthomas@bendoregon.gov

For Street Preservation associated questions: Paul Neiswonger, Streets Supervisor

541-317-3035, pneiswonger@bendoregon.gov

Closures and detours in Bend are updated weekly at: bendoregon.gov/traffic

Find some-more information about travel operations at: bendoregon.gov/streetpreservation

Weekly reports can be perceived around email by subscribing to Weekly Road and Traffic Reports at: bendoregon.gov/enews

Leave a Reply

Your email address will not be published. Required fields are marked *