City of Bend highway and trade report: Week of May 31-June 6

BEND, Ore. (KTVZ) — Here is a city of Bend’s highway and trade news for a week of May 31-June 6.

You’ve beheld by now that construction deteriorate has started. As we navigate your approach by a City streets and neighborhoods, greatfully remember to delayed down, review a signs and stay on a designated highway routes. Check-in weekly with a City on arriving closures by a website: bendoregon.gov/traffic. Construction deteriorate will not final forever, greatfully be studious and remember to expostulate like you’re in your possess neighborhood.

  • NE 8th Street between NE Marlon Place and NE Bennington Way for infrastructure installation, singular line closure with minimal impacts, starts 5/24/21
  • Brookswood Blvd and Hollygrape Street – reserve island, quell ramp, and crosswalk construction – Lane shifts and spin line closures on Brookswood, 5/24/21 – 6/28/21. For serve information, visit bendoregon.gov/streetsafety
  • SW Simpson – Columbia intersection – Closed for Roundabout construction commencement May 17th – August. Full closure of intersection with detour. For serve information, visit bendoregon.gov/Columbia-roundabouts.
  • NE Butler Market – Purcell Intersection – sealed for devious construction commencement May 3rd – midst September. This is partial of a sovereignty mezzanine project. For serve information, visit bendoregon.gov/empire.
  • NW Skyline Ranch Road between NW Chianti Lane and NW Shevlin Meadow Drive for infrastructure installation, full highway closure, starts 4/12/2021
  • Via Sandia Neighborhood Extension Project – Roads sealed for Sewer categorical designation with internal access, 5/17/21 – 6/30/21. For serve information, visit bendoregon.gov/city-projects/infrastructure-projects/septic-to-sewer-conversion-program/via-sandia-east-lake-drive-orion-drive-sewer-project.
    • East Lake Drive between Twin Lakes Loop and Newberry Drive
    • Twin Lakes Loop Between SE 15th Street and Newberry Drive
    • Via Sandia between Sky Harbor Drive and Cabin Court
    • Cabin Ct between Via Sandia
  • SW Simpson Avenue between SW 15th Street and SW 18th Street for right of approach improvements, full highway closure with detour, 3/15/21 – 6/18/21
  • Newport Corridor Improvements Project – Various intersections along Newport Avenue to be sealed due to updates in a H2O categorical and stormwater facilities. Road closures associated to a plan listed below.
    • NW Nashville Ave between NW Drake Road and NW Newport Ave for infrastructure installation, full highway closure, starting 4/5/21
    • Intersection of 9th Street and Newport Avenue for infrastructure installation, full devious closure with detour, starting 4/5/21

Future Road Closures:

  • SW Sisemore Street between Cleveland Avenue and McKinley Avenue for H2O categorical use replacements, Full highway closure with internal access, 6/7/21 – 6/18/21

Work schedules are contingent on continue conditions and other factors. Always practice increasing counsel within construction zones. Drivers should use designated highway routes. Nearby residential streets are for internal trade only.

Contact: Kyle Thomas, Construction Manager

541-323-8519, kthomas@bendoregon.gov

For Street Preservation associated questions: Paul Neiswonger, Streets Supervisor

541-317-3035, pneiswonger@bendoregon.gov

Closures and detours in Bend are updated weekly at: bendoregon.gov/traffic

Find some-more information about travel operations at: bendoregon.gov/streetpreservation

Weekly reports can be perceived around email by subscribing to Weekly Road and Traffic Reports at: bendoregon.gov/enews