First Warning Traffic – Midtown Tunnel Closed This Weekend


First Warning Traffic

First Warning Traffic

First Warning Traffic

First Warning Traffic

BRIDGE OPENINGS:

*NEW SET SCHEDULE* Gilmerton Bridge 9:00 AM, Noon, 3:00 PM and 7:00 PM – M-F Daily – 9:00 AM 3:00 PM Saturday and Sunday

*

ERT DOWNTOWN AND MIDTOWN TUNNELS, CONSTRUCTION SCHEDULE: Friday, Jul 29 to Friday, Aug 5

 U.S. 58 East: Midtown Tunnel EB Full weekend hovel closure from Friday, Jul 29 during 8 p.m. by Monday, Aug 1 during 5 a.m. Detour to 264.

U.S. 58 East/Brambleton Avenue: Ramp full closure Tuesday by Thursday, Aug. 2-4 from 9 a.m. to 3 p.m. any day.

U.S. 58 East: Full weekend hovel closure from Friday, Aug.5 during 8 p.m. by Monday, Aug. 8 during 5 a.m.

 London Boulevard/U.S. 58: On-ramp full closure from Friday, Jul 29 during 8 p.m. until Monday, Aug. 1 during 5 a.m.

 U.S. 58/ London Boulevard East: Off-ramp full closure Monday by Thursday, Aug. 1-4 from 7 p.m. any night until 5 a.m. a following morning.

 Frederick Boulevard North and South on-ramps to I-264 East: Ramp full closure Tuesday by Thursday, Aug. 2-4 from 8 p.m. any night until 5 a.m. a following morning.

 High Street: Full closure between Constitution Avenue and Confederate Avenue from Monday Aug. 1 during 5 a.m. by Friday Aug. 19 during 7 p.m. for 24 hours a day.

*

HAMPTON ROADS WEEKLY LANE CLOSURES REPORT: For a week of Jul 29, 2016 by Aug 5, 2016

  • I-64 Widening Project, Newport News/York County: Single-lane closures eastward and westbound Aug 3 as early as 9 p.m. until 5 a.m. a following morning. All work will take place between Jefferson Avenue and Lee Hall, and one line will sojourn open to trade during all times. Please check http://www.i64widening.org/news_information/traffic_alert.asp for a latest closure/detour information.
  • Elizabeth River Tunnels/Martin Luther King, Jr. Freeway:  Please check Elizabeth River Tunnels website for a latest closure and highway information per a Downtown Tunnel, Midtown Tunnel and a MLK Freeway.
  • Terminal Boulevard Resurfacing, Norfolk: Full weeknight/weekend closures eastbound/westbound as follows:
  • Weekend of Jul 29-August 1: Eastbound full closure from Friday during 8 p.m. until Monday during 5 a.m.
  • Weeknights Aug 2-4: Westbound full closure from 8 p.m. until 5 a.m. a following morning.
  • I-64 Hampton Roads Bridge-Tunnel: Single-lane closures westbound. One line will sojourn open during all times. Also, a 15th View on-ramp embankment will be sealed as follows:
  • Westbound Aug 3-4 from 9 p.m. until 5 a.m. a following morning.
  • The 15th View westbound on-ramp embankment to I-64 will be sealed Aug 3-4 from 9 p.m. until 5 a.m. a following morning.
  • I-664 Monitor-Merrimac Memorial Bridge-Tunnel: Alternating line closures southbound as follows. One line will sojourn open during all times:
  • Southbound Aug 2-4 from 10 a.m. until 2 p.m.
  • US-17 James River Bridge: Night-time single-lane closures southbound Jul 31-August 4 from 9 p.m. until 5 a.m. a following morning. One line will sojourn open to trade during all times.
  • I-64 High Rise Bridge: Single-lane closures as follows. One line will sojourn open during all times:
  • Westbound Aug 1-4 from 9 p.m. until 5 a.m. a following morning.
  • US-17 George P. Coleman Memorial Bridge: Both northbound and southbound few trade blocking to final adult to 20 mins Aug 3 from 10 a.m. until 11 a.m.
  • I-664 Northbound Ramp to I-64 Westbound, Hampton: Night-time single-lane closures Jul 31 from 8 p.m. until 5 a.m. a following morning from I-664 northbound ramp to I-64 westbound. One line will sojourn open during all times.
  • Mercury Boulevard on-ramps to I-64 Eastbound/Westbound, Hampton: Two on-ramps to I-64 eastward and westbound will be sealed as follows:
    • The on-ramp from Mercury Boulevard south to I-64 westbound will be sealed Jul 31-August 4 from 8 p.m. until 5 a.m. a following morning.
    • The on-ramp from Mercury Boulevard south to I-64 eastward will be sealed Jul 31-August 4 from 8 p.m. until 5 a.m. a following morning.
  • I-564 Eastbound/Westbound, Norfolk: Night-time single-lane closures as follows. One line will sojourn open during all times:
    • I-564 Westbound Aug 1-3 from 7 p.m. until 4 a.m. between Terminal Boulevard and Norfolk Naval Station Gate 3A 3.
    • I-564 Eastbound Aug 1-4 from 7 p.m. until 4 a.m. between Terminal Boulevard and Norfolk Naval Station Gate 1 2.
  • Military Highway Continuous Flow Intersection, Norfolk: Alternating line closures northbound and single-lane closures southbound as follows. One line will sojourn open during all times:
    • July 31-August 5: Single-lane closures northbound and southbound from 9 a.m. to 3 p.m. and from 7 p.m. until 5 a.m. a following morning on Military Highway between Robin Hood Road and a intersection of Military Highway/Princess Anne Road.
    • August 5: Intermittent trade stoppages during a tyrannise channel on Military Highway from 7 p.m. to 5 a.m. a following morning.
  • August 6-26: Consecutive single-lane closures northbound and southbound on Military Highway.
  • US-13 (Lankford Highway), Northampton County: Daytime single-lane closures northbound and southbound between Onley and Painter. One line will sojourn open during all times:
    • August 1-4 from as early as 6 a.m. until as late as 8:30 p.m.
    • August 5 from as early as 6 a.m. until 12 p.m.
  • US-58 East/West, Town of Courtland: Alternating line closures eastward and westbound Aug 1-4 from 6 a.m. until 9 p.m. and Aug 5 from 6 a.m. until 12 p.m. One line will sojourn open during all times.
  • Route 301 Sussex Drive, Greensville County: Consecutive left northbound line closure for overpass deputy Jun 23 by late summer on Route 301.
  • Route 680 over Stallings Creek, Isle of Wight County: Full uninterrupted closure on Route 680 over Stallings Creek for overpass deputy May 16 by Jun 2017.
  • Route 621 over Passenger Swamp, Isle of Wight County: Full uninterrupted closure on Route 621 over Passenger Swamp for overpass deputy Jun 28 by Jun 2017.
  • George Washington Memorial Highway (Route 17), York County: Crews are widening a highway between Route 630 (Wolf Trap Road) and Route 706 (Hampton Highway). Daytime single-lane closures, from 9 a.m.to 3 p.m. and weeknight single-lane closures, from 7 p.m. to 5 a.m. Expect trade shifts and delays. For some-more about this project, greatfully revisit a Route 17 Widening website.

*

CHESAPEAKE ROAD WORK:  Battlefield Blvd/Medical Pkwy intersection closures Monday, Jul 11 by September

Public Utilities will tighten several lanes during a Battlefield Blvd and Medical Pkwy intersection over a subsequent 10 weeks for a deputy of H2O and cesspool lines in a area.  Next week a right-turn line on Medical Pkwy will be closed.