First Warning Traffic: Tuesday Traffic Alerts


traffic generic

traffic generic

 

CHESAPEAKE ROAD WORK:

DOMINION BLVD:

Veterans Bridge singular line closures overnight (9pm-6am) Jun 13-16.

*Veterans Bridge full weekend closure starting 9pm on Friday, Jun 17 by 5am Monday, Jun 20.  A NEW trade fixing during Dominion Lakes Blvd will be in place once alley reopens Monday morning. 

Veterans Bridge full overnight closures (9pm-5am) Jun 20, 22, 24, 28, 30.

Cedar Rd closure during Dominion Blvd overnight (9pm-5am) Jun 21.

For some-more information revisit www.DominionBoulevard.com

NORTH BATTLEFIELD BLVD LANE CLOSURE

Southbound North Battlefield Blvd during Medical Pkwy. The Public Utilities Department will reinstate a cesspool line in southbound lanes of North Battlefield Blvd during Medical Pkwy from Jun 15 to Aug 31.  The work will need several singular line closures.  Access to Medical Pkwy and Chesapeake Regional Healthcare will be confirmed during all times.  Motorists should be warning to work crews, apparatus in a area and probable delays.

*

Pamlico Sound Ferry Routes On Alternate Schedules Jun 14-17
Repairs to be done on M/V Swan Quarter

Manns Harbor – Due to a automatic emanate on a M/V Swan Quarter, a North Carolina Ferry System’s Pamlico Sound routes will be on swap schedules between Tuesday, Jun 14 and Friday, Jun 17.

The swap schedules are as follows:

Tuesday, Jun 14:

Cedar Island to Ocracoke: 7:00 a.m., 10:00 a.m., 4:00 p.m.
Ocracoke to Cedar Island: 7:30 a.m., 1:00 p.m., 4:00 p.m.
Swan Quarter to Ocracoke: 7:00 a.m., 1:00 p.m., 4:30 p.m.
Ocracoke to Swan Quarter: 10:00 a.m., 1:00 p.m.

Wednesday, Jun 15 – Friday, Jun 17:

Cedar Island to Ocracoke: 7:00 a.m., 10:00 a.m., 4:00 p.m.
Ocracoke to Cedar Island: 7:30 a.m., 1:00 p.m, 4:00 p.m.
Swan Quarter to Ocracoke: 10:00 a.m., 1:00 p.m., 4:30 p.m.
Ocracoke to Swan Quarter: 7:00 a.m., 9:30 a.m., 12:45 p.m.

The routes are scheduled to resume normal operations on Saturday, Jun 18.

*

TERMINAL BOULEVARD RESURFACING PROJECT

Norfolk, Va. – Full directional weeknight and weekend closures of Terminal Boulevard Eastbound (traveling from Hampton Boulevard towards I-564)

Full Directional Closure Work Hours:

8 p.m. to 5 a.m. weeknights
8 p.m. Friday to 5 a.m. Monday on weekends

Construction on Terminal Boulevard Eastbound (traveling from Hampton Boulevard towards I-564) will continue any weeknight and weekend until crews finish all work in that direction. Crews will afterwards switch over and start work on Terminal Boulevard Westbound (traveling from I-564 towards Hampton Boulevard) where full directional weeknight and weekend closures will continue until construction is finish in Jan of 2017.

  • There will be no work on vital holidays, and all lanes will be open during rush hour periods.
  • Traffic will be detoured regulating I-564/Admiral Taussig Boulevard and Hampton Boulevard.
  • Neighborhood entrance will be confirmed via Diven St. or Meredith St. during full closures.
  • Access to Ruthven Road (Sewells Point Golf Course) will be maintained.

*

HAMPTON ROADS WEEKLY LANE CLOSURES REPORT 

ERT WEEKLY CONSTRUCTION SCHEDULE:

From Friday, June 10 to Friday, Jun 17

I-264 West: Downtown Tunnel open with a singular line closure Monday by Thursday, Jun 13-16 from 8 p.m. any night until 5 a.m. a following morning.

I-264 East: Downtown Tunnel open with a singular line closure Monday by Thursday, Jun 13-16 from 8 p.m. any night until 5 a.m. a following morning.

Effingham Street/I-264 East: Intermittent stoppages Monday by Sunday, Jun 13-19 from 9 a.m. to 3 p.m. any day.

I-264 East/West: Full widespread closure between Effingham Street and Frederick Boulevard Friday and Saturday, Jun 17 and 18 from 8 p.m. to 8 a.m. and Sunday, Jun 19 from 8 p.m. by 5 a.m. a following morning.

Frederick Boulevard Northbound: Full closure between Deep Creek Boulevard and Turnpike Road Friday by Sunday, Jun 17-19 from 8 p.m. any night until 5 a.m. a following morning.

 I-64 Widening Project, Newport News/York County: Single-lane closures eastward and westbound Jun 12-16 as early as 8 p.m. until 5 a.m. a following morning. All work will take place between Jefferson Avenue and Lee Hall, and one line will sojourn open to trade during all times. Please check http://i64widening.org for a latest closure/detour information.

 Elizabeth River Tunnels/Martin Luther King, Jr. Freeway:  Please check Elizabeth River Tunnels website for a latest closure and highway information per a Downtown Tunnel, Midtown Tunnel and a MLK Freeway.

 I-564 Intermodal Connector, Norfolk: Please check http://www.i564intermodal.com/ for a latest closure/detour information.

 Terminal Boulevard Resurfacing, Norfolk: Full directional weekend uninterrupted closures eastward (traveling from Hampton Boulevard towards I-564) and nightly weeknight closures as follows:

  • June 10-13 from 8 p.m. until 5 a.m. a following morning.
  • Weeknights Jun 13-16 from 8 p.m. until 5 a.m. a following morning.

 I-64 Hampton Roads Bridge-Tunnel: Alternating closures eastward and westbound. One line will sojourn open during all times:

  • Westbound Jun 12-16 from 9 p.m. until as late as 5 a.m. a following morning.
  • Eastbound Jun 12-16 from 9 p.m. until as late as 5 a.m. a following morning.

 I-664 Monitor-Merrimac Memorial Bridge-Tunnel: Alternating line closures as follows. One line will sojourn open during all times:

  • Northbound/Southbound Jun 14-16 from 10 a.m. until 2 p.m.

US-17 James River Bridge: Night-time alternating-lane closures northbound and southbound Jun 13-16 from 9 p.m. to 3 a.m. a following morning. One line will sojourn open to trade during all times.

I-64 High Rise Bridge: Alternating line closures as follows. One line will sojourn open during all times:

  • Eastbound and Westbound Jun 13-16 from 9 p.m. until 5 a.m. a following morning.

US-17 Coleman Bridge: Alternating line closures northbound and southbound Jun 13-14 from 9 a.m. until 2 p.m. One line will sojourn open to traffic.

I-564 Eastbound/Westbound, Norfolk: Daytime and night single-lane closures as follows. One line will sojourn open during all times:

    • Westbound Jun 16 from 9 a.m. until 2 p.m. during a I-564 West Runway Tunnel.
    • Westbound Jun 13-14 from 8:30 a.m. until 2:30 p.m. between Norfolk Naval Station Gate 3A 3 and I-64 West/Granby Street.

I-64 Westbound, James City County: Single-lane closures westbound Jun 13-15 from 8 p.m. to 5 a.m. a following morning during Old Stage Road. One line will sojourn open during all times.

I-64 Eastbound, York County: Single-lane closures westbound Jun 13-16 from 9 p.m. to 5 a.m. a following during US-60 Busch Gardens. One line will sojourn open during all times.

 I-64 Westbound, Newport News: Single-lane closures westbound Jun 13-15 from 9 p.m. to 5 a.m. a following morning during Fort Eustis Boulevard. One line will sojourn open during all times.

 VA-31 N. Jamestown Road, James City County: Alternating line closures Jun 13-17 from 9 a.m. to 3 p.m. from VA-199 to Jamestown Road. One line will sojourn open during all times.

 I-95 Bridge Replacement over a Meherrin River Southbound, Emporia: Consecutive single-lane closures southbound as follows. One line will sojourn open during all times:

    • Southbound Jun 12-16 from 6:30 p.m. until 5 a.m. a following morning between Exit 13 and 11 during a Greensville County and Town of Emporia Line.

Route 680 over Stallings Creek, Isle of Wight County: Full uninterrupted closure on Route 680 over Stallings Creek for overpass deputy May 16 by Jun 2017.

 George Washington Memorial Highway (Route 17), York County: Crews are widening a highway between Route 630 (Wolf Trap Road) and Route 706 (Hampton Highway). Daytime single-lane closures, from 9 a.m.to 3 p.m. and weeknight single-lane closures, from 7 p.m. to 5 a.m. Expect trade shifts and delays. For some-more about this project, greatfully revisit a Route 17 Widening website.